1. 위치
2. 프로젝트 상세
2.1 Sofia (Zone 3, Lackenby B (Tranche B) Dogger Bank - Teesside B)
- Status: Consent Authorised (As of 2020.09)
- Developer: Forewind (100% RWE Renewables)
- Revenue (MWh): 39.65, Revenue (EUR/MWh): 44.96
- Capacity: 1,400 MW (Haliade-X 12 MW)
- Foundation type: Monopile
- Area: 593.21km2
- Distance from shore: 195km
*Draft: 2020.09.03
*Reference: 4coffshore.com
댓글 없음:
댓글 쓰기