[영국] Hornsea Project 1-4 OWF (1,218 MW, MP, Commissioned)

 

1. 위치




2. 프로젝트 상세

2.1 Hornsea Project One (Zone 4, Subzone 1, Heron Wind & Njord)

 - Status: Fully Commissioned (As of 2020.09)

 - Developer: Hornsea 1 Limited (50% Orsted A/S, 50% GlP)

 - Revenue (MWh): 140, Revenue (EUR/MWh): 158.73

 - Capacity: 1,218 MW (SWT-7.0-154)

 - Foundation type: Monopile 

 - Area: 407.34km2

 - Distance from shore: 120km


2.2 Hornsea Project Two (Zone 4, Hornsea Project 2)

 - Status: Under-Construction (to be completed in 2022, As of 2020.09)

    *Cable pulled in by Boskalis (2020.08.25) - Reference

    *Cable supply by LS산전 - Reference

 - Developer: Breesea Limited (100% Orsted A/S)

 - Revenue (MWh): 57.5, Revenue (EUR/MWh): 65.19

 - Capacity: 1,386 MW (SG 8.0-167 DD) (or 1,658 MW based on the Reference)

 - Foundation type: Monopile 

 - Area: 461.89km2

 - Distance from shore: 99.52km


2.3 Hornsea Project Three (Zone 4, Hornsea Three SPC 8)

 - Status: Consent Application Submitted (As of 2020.09)

 - Developer: Orsted A/S (100%)

 - Capacity: 2,400 MW

 - Area: 695.83km2

 - Distance from shore: 121km


2.4 Hornsea Project Three (Zone 4, Hornsea Three SPC 6)

 - Status: Concept/ Early Planning (As of 2020.09)

 - Developer: Orsted A/S (100%)

 - Capacity: 1,000 MW

 - Area: 846.03km2

 - Distance from shore: 65km


*Draft: 2020.09.01

*Last Update: 2020.09.03 - Hornea Two cable works status, Detailed map, LS산전

*Reference: 4coffshore.com 