1. 위치
2. 프로젝트 상세
2.1 Hornsea Project One (Zone 4, Subzone 1, Heron Wind & Njord)
- Status: Fully Commissioned (As of 2020.09)
- Developer: Hornsea 1 Limited (50% Orsted A/S, 50% GlP)
- Revenue (MWh): 140, Revenue (EUR/MWh): 158.73
- Capacity: 1,218 MW (SWT-7.0-154)
- Foundation type: Monopile
- Area: 407.34km2
- Distance from shore: 120km
2.2 Hornsea Project Two (Zone 4, Hornsea Project 2)
- Status: Under-Construction (to be completed in 2022, As of 2020.09)
*Cable pulled in by Boskalis (2020.08.25) - Reference
*Cable supply by LS산전 - Reference
- Developer: Breesea Limited (100% Orsted A/S)
- Revenue (MWh): 57.5, Revenue (EUR/MWh): 65.19
- Capacity: 1,386 MW (SG 8.0-167 DD) (or 1,658 MW based on the Reference)
- Foundation type: Monopile
- Area: 461.89km2
- Distance from shore: 99.52km
2.3 Hornsea Project Three (Zone 4, Hornsea Three SPC 8)
- Status: Consent Application Submitted (As of 2020.09)
- Developer: Orsted A/S (100%)
- Capacity: 2,400 MW
- Area: 695.83km2
- Distance from shore: 121km
2.4 Hornsea Project Three (Zone 4, Hornsea Three SPC 6)
- Status: Concept/ Early Planning (As of 2020.09)
- Developer: Orsted A/S (100%)
- Capacity: 1,000 MW
- Area: 846.03km2
- Distance from shore: 65km
*Draft: 2020.09.01
*Last Update: 2020.09.03 - Hornea Two cable works status, Detailed map, LS산전
*Reference: 4coffshore.com