2020년 9월 3일 목요일

[대만] Changfang phase 1-2 OWF ( 541.2 MW, JK, Under-Construction)

  1. 위치




2. 프로젝트 상세

2.1 Changfang - phase 1

 - Status: Under-Construction (First Power expected around 2022.2Q)

 - Developer: Changfang Wind Power Generation Co., Ltd.

    *EPCI: CSBC Corporation (87.5% CIP, 7.44% Taiwan Life Insurance, 5.06% TransGlobe LIfe)

 - Revenue (MWh): 5516, Revenue (EUR/MWh): 162.17

 - Capacity: 95 MW (V174-9.5MW)

 - Foundation type: Jacket (Piled)

 - Area: 18.3 km2


2.2 Changfang - phase 2

 - Status: Under-Construction (Commencement from 2021.1Q, COD expected around 2024.1Q)

 - Developer: Changfang Wind Power Generation Co., Ltd.

    *EPCI: CSBC Corporation (87.5% CIP, 7.44% Taiwan Life Insurance, 5.06% TransGlobe LIfe)

 - Revenue (MWh): 5516, Revenue (EUR/MWh): 162.17

 - Capacity: 446.2 MW (V174-9.5MW)

 - Foundation type: Jacket (Piled)

 - Area: 64.26 km2

 - Distance from shore: 15.2 km


*Draft: 2020.09.04

*Update Status: 2020.12.08

*Reference: 4coffshore.com & others

댓글 없음:

댓글 쓰기

2020년 글로벌 해상풍력 하부구조물 Type 통계

Rystad Energy에서 발표한 2020년 글로벌 해상풍력 하부구조물 Type 통계 ( 2020.02.13 발간 ) 주요내용 1. 2020년 설치될 Jacket type FOU는 258개 예상, 전체 FOU 중 약 20% (역대 최대 비중) 2. ...